The current passage is an emergency exit. The new passage must be able to accommodate the same number of people.
Lighting will be installed, the stairs on the outside will be adapted and the entrance will get a sign with the UvA logo and building indicators. Finally, there will be an awning and a partition between the extra pedestrian entrance and the suppliers' entrance to REC I and CREA.