The tower crane's crane leg.

At the beginning of this week the crane, on the side of Polder Restaurant, was dismantled and at the end of next week the demolition of the crane pedestal can be carried out. Because the foundation consists of reinforced concrete, the concrete parts have to be cut. This may cause some noise nuisance. The work will be carried out between 7 am and 4 pm.